V6ProductivityEfficiency
Predict which worker will drop off all their boxes first! Based on their position, do you think worker 1 or worker 2 will?
Experiment by adding boxes, workers, drop-off bins and walls. Please only add agents with "2" in the name to the "2" side (ex: Box2). Wall is the only agent without a 2 in the name that can also be added to side 2.
This is a model that demonstrates the time efficiency of different workplace setups. There can be various obstacles in the way making the work take longer to complete the tasks.
This is a model that demonstrates the time efficiency of different workplace setups. There can be various obstacles in the way making the work take longer to complete the tasks.
Data | |
---|---|
Created: | June 25, 2020 |
Played: | 5 |
Parent Project: | 1408593 |
false
Settings
New Project Name
Rename
Copy
Download
Show Project Report
Flag Project
Delete
Predict which worker will drop off all their boxes first! Based on their position, do you think worker 1 or worker 2 will?
Experiment by adding boxes, workers, drop-off bins and walls. Please only add agents with "2" in the name to the "2" side (ex: Box2). Wall is the only agent without a 2 in the name that can also be added to side 2.
This is a model that demonstrates the time efficiency of different workplace setups. There can be various obstacles in the way making the work take longer to complete the tasks.
This is a model that demonstrates the time efficiency of different workplace setups. There can be various obstacles in the way making the work take longer to complete the tasks.
Edit Description
Design